Skip to main content

Procedure - Maintenance Daily Task

Section: Human Resource Procedure 
Procedure Owner: Ignition633 Ministries Nigeria Human Resources  
Procedure Name: Maintenance Daily Task Procedure   
Origination Date: September 2024

Purpose
The purpose of the Daily Maintenance Tasks Procedure isaims to ensure the routine upkeep and operational readiness of critical systems and equipment by setting clear daily responsibilities for maintenance staff. This procedure aims to maintain proper fluid levels in tanks, ensure cleanliness, and manage maintenance requests efficiently.

Scope
This procedure applies to all maintenance personnel responsible for daily checks and upkeep of water tanks, generators, fuel levels, and office spaces. 

Daily TaskMaintenance Procedure
- Check and fillFill the Water Tank Daily
- Inspect the water tank daily.daily Tankto shouldensure the water level does not godrop below half.half capacity.
- If the water level is low, begin the filling process immediately.

Important:
- Do not walk away while the tank is being filled.
- You must remain by the tank to monitor the process and prevent overfilling or accidents.
- Only turn off the valve once the tank is full and you have verified that the filling has stopped.

Failure to comply with this instruction will lead to serious corrective action.

Check and fillFill Large Generator Daily
- Inspect the large Generatorgenerator’s daily.fuel Tanktank shoulddaily to ensure it is not go below half.half capacity.
- If the fuel level is low, refill the tank to full.
- Do not walk away while filling the generator's tank. Remain stationed by the tank and turn off the fuel supply valve only after verifying that the filling has been completed.

Check the Fuel Level in the Storage Tank
- Inspect the fuel level in the main storage tank.tank Tankdaily. shouldEnsure that it does not gofall below the black line.line marking.
- If the level approaches the black line, alert the supervisor for refueling arrangements.
- Record the current fuel level in your daily maintenance log.

Office Space Cleanliness and Organization
- Ensure your office space is always neat, orderly, and clean.
- Properly organize tools, documents, and equipment to facilitate efficient work processes.
- Empty trash bins, wipe down surfaces, and vacuum/sweep the area as needed.

Complete scheduledScheduled Maintenance Request forms.Forms
- Review any Maintenance Request forms assigned to you each day.
- Prioritize tasks based on urgency and complete all scheduled maintenance promptly.
- Document the actions taken and sign off on each task before submitting the completed forms.

Clean upUp afterAfter Maintenance Jobs
- After completing any maintenance jobs.

work,

WHENensure FILLINGthe THEarea TANKS,is DOthoroughly NOTcleaned.
- WALKDispose AWAY!of YOUwaste
MUSTproperly, BEorganize STATIONEDtools, BYand THEwipe TANKdown THEsurfaces.
- ENTIREEnsure TIMEthe ITarea ISis FILLINGleft UP.as ONLYclean WALKas AWAYor ONCEcleaner YOUthan HAVEbefore ENSUREDyour YOU HAVE TURNED OFF THE VALVE. Failure to comply will result in serious disciplinary action.
work.

--------------------------------------------------------------------------------------------------------------------------------------------
This procedure will be reviewed annually and is subject to change. Any changes will be communicated to all employees promptly. 

For any questions or further assistance regarding this procedure, employees should contact the HR department at hr.nigeria@ignition633.org.