Procedure - Block Maintenance
Section: Human Resource Procedure
Policy Owner: Ignition633 Ministries Nigeria Human Resources
Policy Name: Block Maintenance procedure
Origination Date: August 2024
Purpose
This procedure outlines that concrete blocks produced at Ignition 633 Construction are properly maintained to preserve their quality, structural integrity, and longevity during storage and use.
Scope
This procedure applies to all construction personnel responsible for handling, storing, and inspecting concrete blocks at the ministry's construction site. It covers maintenance activities such as storage, handling, inspection, and replacement of damaged blocks.
Policy Statement
Clean Molds
Make sure molds are clean when removing them from the machine after finishing. Ensure that, no concrete residue remains inside the mold or on the male mold plates to produce a healthy block
Lubricate Mold
After making sure that the mold is clean: Lubricate the mold eyes and male mold plates with a hand pump if any is required this facilitates the smooth removal of blocks from the mold
Curing
The block takes two days to dry. In these two days, it will be watered every morning and evening.
Cubing
In construction, cubing typically involves determining how many cubic units a space or structure occupies. This is useful for estimating material quantities, such as concrete, or organizing and stacking physical blocks to fill a specific volume. Cubing helps to prevent damage through stacking.
--------------------------------------------------------------------------------------------------------------------------------------------
This procedure will be reviewed annually and is subject to change. Any changes will be communicated to all employees promptly.
For any questions or further assistance regarding this policy, employees should contact the HR department at hr.nigeria@ignition633.org.